PNP successfully completed the design and engineering of its largest Fast Water Series Public Safety Barrier project supporting Ontario Power Generation’s Des Joachims Generating Station and McConnell Lake Control Dam.
Search Results
Advancing Water Infrastructure with HDPE
Pacific Netting Products will showcase custom HDPE floating structures at the USSD conference in Austin. Visit booth 419 to explore innovative solutions.
Innovative Floating Breasting Log False Creek, Canada
Custom 36” HDPE breasting log installed in False Creek, Canada—built for strength, safety, and a 50-year service life in marine environments.
Enhancing Fish Habitat with a Temperature Curtain Barrier, Whiskeytown Dam
In response to a BOR request, PNP designed, built, and installed a custom temperature curtain fabricated from five-ply, 60 mil CSPE Hypalon.
PNP Launches Custom HDPE Floating Work Barge in Kingston, WA
Discover Pacific Netting Products’ new custom HDPE floating work barge in Kingston, WA—a purpose-built, highly stable platform designed for marine operations like maintenance, heavy lifting, and fieldwork. Fully customizable to meet diverse project needs.
MultiFunction Boom for Fish Passage and Debris Control in Clackamas River, Portland
Pacific Netting Products (PNP) continues to lead in waterway protection with its innovative solutions for fish passage and debris control. A recent project with Portland General Electric (PGE) showcases two of PNP’s advanced systems: the Guide Net System and the MultiFunction Debris Boom with Boat Gate.
Public Safety Barrier for Buffalo Pound Dam
Buffalo Pound dam was outfitted with HDPE public safety barriers to protect critical infrastructure and recreational boats.
